Projects

Selected roadway, pipeline, trail, and transit projects from 15 years of civil engineering work across the Dallas-Fort Worth region. Choose a category to see project details.

Paving

Roadway, alley, ADA, and highway design for North Texas cities, DFW Airport, and TxDOT.

15 projects

  • 12th–Jefferson Connector
  • Merit Drive Phase 2 (Clodus Fields to IH 635)
  • Duncanville Main Street Corridor Study
  • Forest Hills ADA Improvements
  • Alley Reconstruction Group 17-403
  • Madrid Alley
  • Drayton Drive Stabilization and Repairs
  • Esters Boulevard Rehabilitation
  • Old Campbell Road (Nantucket to Campbell Road)
  • Railroad Crossing Improvements
  • IH 35W Segment 3B
  • FM 1220 Widening
  • Johnson County Intersection Improvements
  • Alma Road / Silverado Trail Roadway and Intersection Improvements
  • Custer Road Lanes 5 and 6

Pipeline

Water and wastewater main replacements using open-cut and trenchless methods.

6 projects

  • 2018 Pipeline Design
  • Greenbriar Estates Water/Wastewater Improvements
  • Kessler Park Water Main Replacements
  • Water and Wastewater Main Replacements (Contract No. 16-351/352E)
  • Major Vault and Valve Replacement
  • Munger Place Water Main Replacements (Contract No. 14-115/166E)

Parks & Recreation

Trail, park, and creek bank projects for Dallas, DART, NCTCOG, and Irving.

4 projects

  • Kleberg Trail
  • Veloweb Hike and Bike Trail
  • Southern Dallas County Veloweb Study
  • Bird’s Fort Park Creek Bank Stabilization

Transit

Light rail and bus stop accessibility design for Dallas Area Rapid Transit.

3 projects

  • DART SOC-3
  • DART Amenity Pad Design (PWA 39)
  • DART Amenity Pad Design and Oversight (PWA 72)