Selected roadway, pipeline, trail, and transit projects from 15 years of civil engineering work across the Dallas-Fort Worth region. Choose a category to see project details.
Paving
Roadway, alley, ADA, and highway design for North Texas cities, DFW Airport, and TxDOT.
15 projects
- 12th–Jefferson Connector
- Merit Drive Phase 2 (Clodus Fields to IH 635)
- Duncanville Main Street Corridor Study
- Forest Hills ADA Improvements
- Alley Reconstruction Group 17-403
- Madrid Alley
- Drayton Drive Stabilization and Repairs
- Esters Boulevard Rehabilitation
- Old Campbell Road (Nantucket to Campbell Road)
- Railroad Crossing Improvements
- IH 35W Segment 3B
- FM 1220 Widening
- Johnson County Intersection Improvements
- Alma Road / Silverado Trail Roadway and Intersection Improvements
- Custer Road Lanes 5 and 6
Pipeline
Water and wastewater main replacements using open-cut and trenchless methods.
6 projects
- 2018 Pipeline Design
- Greenbriar Estates Water/Wastewater Improvements
- Kessler Park Water Main Replacements
- Water and Wastewater Main Replacements (Contract No. 16-351/352E)
- Major Vault and Valve Replacement
- Munger Place Water Main Replacements (Contract No. 14-115/166E)
Parks & Recreation
Trail, park, and creek bank projects for Dallas, DART, NCTCOG, and Irving.
4 projects
- Kleberg Trail
- Veloweb Hike and Bike Trail
- Southern Dallas County Veloweb Study
- Bird’s Fort Park Creek Bank Stabilization
Transit
Light rail and bus stop accessibility design for Dallas Area Rapid Transit.
3 projects
- DART SOC-3
- DART Amenity Pad Design (PWA 39)
- DART Amenity Pad Design and Oversight (PWA 72)